Free template

Purchase order template for Excel and Google Sheets

A free CSV purchase order you can fill in and send. Enter your supplier, ship-to address and line items; the line totals, subtotal, tax and order total calculate themselves.

Download the template

One sheet: PO number and date, supplier and ship-to blocks, 20 line items, then subtotal, shipping, tax and total. Every input cell starts blank except shipping and tax rate, which start at 0.

Download the free CSV template

Sample purchase order

Three lines from a clothing supplier, with $45 shipping and an 8% tax rate. These are the numbers the sheet's formulas produce.

SKU and descriptionQuantityUnit costLine total
TEE-BLK-M · Organic cotton tee, black, M48$6.40$307.20
TEE-BLK-L · Organic cotton tee, black, L36$6.40$230.40
HOOD-GRY-M · Fleece hoodie, grey, M24$14.75$354
Subtotal$891.60
Shipping$45
Tax (8% of subtotal)$71.33
Total$1,007.93

How to fill it in

PO number and date
Give every order its own number, in sequence, so you and the supplier can refer to it on invoices and receipts.
Expected delivery date
The date you need the goods, agreed with the supplier.
Payment terms
When you pay: for example Net 30, or a deposit now and the balance before shipping.
Supplier and ship to
Who you are buying from, and the address the goods go to.
Line items
One row per SKU: description, quantity and unit cost. The line total fills in once quantity and unit cost are both entered.
Shipping and tax rate
Enter the freight charge, and the tax rate as a plain number: 8 for 8%. Typing 8% instead makes the sheet read 0.08 and undercharge tax a hundredfold. The sheet applies tax to the subtotal only; add shipping to the taxed amount yourself if your rules require it.
Terms and notes
Anything else the supplier must follow: packing, labelling, delivery windows.

Working out the quantity on each line

The template totals an order; it does not tell you how much to order. For each SKU, cover the demand you expect until the next order after this one arrives, plus a safety buffer, less what you already hold or have on order.

Order quantity = average daily demand × (lead time + days until your next order) + safety stock − on hand − already on order

Say a SKU sells 12 a day, the supplier takes 21 days and you order every 14 days. You need 12 × 35 = 420 units to get to the following delivery. Add 60 units of safety stock to make 480. You hold 150 and have 50 still on an open order, so the line is 480 − 150 − 50 = 280. If the supplier ships in cases of 24, round up to 288, which is 12 cases.

Set the buffer with the safety stock calculator, check when to place the order with the reorder point calculator, and price freight and duty into unit cost with the landed cost calculator.

Before you send it

Quantities against minimums and case packs
A line below the supplier's minimum order quantity, or a quantity that splits a case, comes back as a query and costs you days of lead time.
Unit costs against the latest quote
Price from the supplier's current quote or price list, not last year's invoice. The invoice is checked against this order, so an old price here becomes a dispute later.
Open orders for the same SKU
Stock already on order is the most common cause of double buying. Subtract it before you fix the quantity.
The delivery date against your stock
If what you hold runs out before the expected delivery date, the order is late before it is sent: order more now, ask for a split shipment, or expedite.
Ship-to and terms
A wrong warehouse address or missing labelling instructions is cheap to fix on the order and expensive to fix on the dock.

Excel and Google Sheets

In Excel, open the CSV and save it as a workbook so your formatting stays. In Google Sheets, choose File, then Import, and upload the CSV. The line totals and order totals are live formulas in both.

Not sure how many to order? The order quantity calculator works out a quantity with case-pack rounding.

From a template to a drafted order

A template records an order you have already worked out. Skuvelo works it out: it tells you what to reorder, how many and when, then drafts the purchase order for you to review, packed to case size and minimums. Sending it to a supplier is always a deliberate action you take. See how Skuvelo drafts purchase orders, or read how to email a purchase order to your supplier.

Questions

Is the purchase order template free?

Yes. Download the CSV without an email address or sign-up.

What should a purchase order include?

A PO number and date, the supplier and ship-to addresses, each line's SKU, description, quantity and unit cost, the order total, payment terms and the date you expect delivery.

How does the template calculate totals?

Each line total is quantity × unit cost, rounded to cents. The subtotal sums the line totals, tax is the subtotal × your tax rate, and the total adds subtotal, shipping and tax.

Can I use it in Excel or Google Sheets?

Yes. Open the CSV in Excel or import it into Google Sheets; both read the included formulas.

What is the difference between a purchase order and an invoice?

You send the purchase order before delivery to say what you want to buy and at what price. The supplier sends the invoice afterwards to ask for payment. Check each invoice against its purchase order and what you actually received before you pay it.

How do I handle a supplier that ships only part of the order?

Record what arrived against the order's lines and leave the rest open, so the shortfall still counts as on order. Do not raise a new purchase order for the missing units unless the supplier cancels them.

Is a purchase order a contract?

Once the supplier accepts it, a purchase order usually records the agreed items, prices and terms. Check with your own adviser for what applies to you.

A template records the order. Skuvelo drafts it.

Skuvelo drafts the purchase order and shows you every number behind it. Sending it to a supplier is always a deliberate action you take.